中文 | English
NEEWS

2024-03-28 2017-08-04 CEICloud Beijing Yizhuang Data Center won the Class A Machine Room Certification

What is the data center site infrastructure evaluation certification?
The data center site infrastructure evaluation services program was launched by CQC, covering the building, fire, location, equipment layout, structure, environment, electrical, air conditioning, monitoring system, etc., to provide customers with all-round, the whole process evaluation services in ways that help customers control the quality and improve competitiveness.CEICloud Beijing Yizhuang Data Center won Class A Certification in July 2017, which showed that it was the 13th data center passing the class certification.
\
Brief Introduction of CEICloud Beijing Yizhuang Data Center
  • Obtained the project approval of Beijing Development and Reform Commission in July 2015
  • Construction started in October 2015
  • Completed in September 2016
  • Formally put into operation in January 2017
Location
It is located in Beijing Economic and Technological Development area, away from residential areas and hazardous goods production/storage/transportation environment, waste landfill and incineration plant. 1.3KM from Jinghailu Station of Yizhuang line subway, and 4KM from Beijing-Shanghai high-speed road. Distance to airport: 18.6KM (Nanyuan Airport) / 38.5KM(Capital Airport)
\
Park Overview
Covering an area of 70 acres of independent parks, with a 11,000 cabinets in the BD 1, it is the largest single cabinet in Asia. data center construction was in line with national standards GB50174-2008 A, the US standard ANSI / TIA / EIA 942 T3 + level, PUE <1.5.
\
\
\
Power Supply
Commercial power comes from two independent substations, a dual 48000KVA in the BD 1. International first-line brand UPS, 2N or N + 1 redundancy form. Use "Caterpillar" 2000kVA diesel generator, N +2 redundancy form, and parallel operation time is less than 30 seconds, and storage tank / underground oil depot reserve time is 24 hours.
\
\
Photovoltaic Power Supply
The top floor of the data center is equipped with 800KW photovoltaic power plant and a heat recovery system that can provide heating for the park construction and for the generator in the winter (to reduce the power consumption for winter generator water jacket heating).
\
Facility
Use full water cooling manner, "York" refrigeration unit N + 1 redundant configuration, precision air conditioning N + 1 or N + 2 redundancy. 15 minutes of cold storage tank storage. Gas fire suppression type IG541, equipped with very early alarm system.
\
\
\
Network Access
Three cable of Telecommunications, Mobile and China Unicom access to the park respectively.
\
\
Operation, Maintenance and Security
More than 80 staff of IT / facilities operation and maintenance team 7 * 24 hours service. Use tension electronic fence to prevent the invasion in the perimeter, the camera covers the park and the machine room building with no dead angle, the video data retention period of the machine room no less than 90 days. Personnel registration and rights management (access to the park, the building, the machine room), the entrance with a professional security equipment.
\
\
\
Park Support
The park has office area, conference room, restaurant, parking lot and other supporting facilities, with wireless network covering the whole area.
\
\
\