■ City electricity access
● Two lines of city electricity from two independent 110KV substations are accessed.
● Set up two separate power supply dividing rooms and two independent open and close stations.
● A distributed layout close to the load is used in the owner distribution room.
■ Generator Unit
● 10 KV medium voltage generator unit is used for parallel operation.
● Two sets of independent back-up diesel heating systems can be used in parallel or independently.
● N+1 redundancy setting is used in each power station, which can operate for 24 hours with full load.
● Setting dedicated test load.